The Loudoun County Office of Mapping and Geographic Information has created maps of five of Loudoun County’s election districts that show the polling places in each district as well as available local and commuter bus routes.
The maps for the five election districts – Algonkian, Ashburn, Broad Run, Leesburg, and Sterling – are online at www.flickr.com/omagi.
If you’re not sure what district you should vote in, you should check your new voter card, which reflect the redistricting plan adopted by the Board of Supervisors in April.
More information about voting in Loudoun County and the upcoming election are online at www.loudoun.gov/vote.
Monday, October 31, 2011
Saturday, October 29, 2011
Metrorail to Open Two Hours Early Tomorrow for Marathon
Metrorail will open two hours early tomorrow, Sunday, Oct. 30, -- at 5 a.m. -- for the Marine Corps Marathon. Buses that normally operate to/from the Pentagon will be rerouted to Pentagon City between 4 a.m. and 4 p.m.
For complete details, see the Metro news release:
http://www.wmata.com/about_metro/news/PressReleaseDetail.cfm?ReleaseID=5073
For complete details, see the Metro news release:
http://www.wmata.com/about_metro/news/PressReleaseDetail.cfm?ReleaseID=5073
For the latest Loudoun County traffic news and information, subscribe to Loudoun County Traffic via your favorite RSS reader, or get Loudoun County Traffic by e-mail.
Roads are Slick - Drive with Caution
Loudoun County public safety ifficials remind residents that there is a current Winter Storm Warning for Loudoun County. Roads are slick and motorists are encouraged to use caution if you must drive. For more visit www.loudoun.gov/mobiletraffic.
For the latest Loudoun County traffic news and information, subscribe to Loudoun County Traffic via your favorite RSS reader, or get Loudoun County Traffic by e-mail.
Friday, October 28, 2011
Loyalty Road Detour Postponed
The small bridge on Loyalty Road, located about 4.5 miles north of Waterford in Loudoun County, was scheduled to be closed for repairs this weekend. But with the possibility of inclement weather this weekend, including the possibility of several inches of snow, the Virginia Department of Transportation (VDOT) has postponed the repairs, tentatively re-scheduling the work for next weekend, Nov. 5-6.
When the work is done, VDOT crews will replace the bridge in the exact same footprint. The existing steel beam and timber deck bridge will be replaced with an all-timber bridge.
When the work is done, VDOT crews will replace the bridge in the exact same footprint. The existing steel beam and timber deck bridge will be replaced with an all-timber bridge.
Dodge Terrace at Farmwell Road Now Open
The Loudoun County Sheriffs Office reports that Dodge Terrace at Farmwell Road is now open.
Dodge Terrace at Farmwell Road
Dodge Terrace at Farmwell Road is closed due to a crash. The traffic signal in this area is also malfunctioning.
The Loudoun County Sheriffs Office reminds residents to remember that an intersection where the traffic signals are off due to power failure must be treated as a four-way stop.
Friday, October 21, 2011
Sobriety Checkpoint Tonight in University Station Area of Loudoun County
The Loudoun County Sheriff’s Office will conduct a sobriety checkpoint tonight, Friday, October 21.
The sobriety checkpoint will be held from 10 p.m. tonight until 3 a.m. Saturday morning in the University Station area (Ashburn/Lansdowne) of Loudoun County.
The Sheriff’s Office designed the checkpoints to raise public awareness and to discourage impaired driving.
“Our ultimate goal is to ensure the roads are safe for all motorists by achieving voluntary compliance with the drinking and driving laws,” said Loudoun County Sheriff Steve Simpson.
Members of the Sheriff’s Office Auxiliary Unit and volunteers from the Loudoun Chapter of MADD will assist with the checkpoint.
The sobriety checkpoint will be held from 10 p.m. tonight until 3 a.m. Saturday morning in the University Station area (Ashburn/Lansdowne) of Loudoun County.
The Sheriff’s Office designed the checkpoints to raise public awareness and to discourage impaired driving.
“Our ultimate goal is to ensure the roads are safe for all motorists by achieving voluntary compliance with the drinking and driving laws,” said Loudoun County Sheriff Steve Simpson.
Members of the Sheriff’s Office Auxiliary Unit and volunteers from the Loudoun Chapter of MADD will assist with the checkpoint.
Thursday, October 20, 2011
Pacific Boulevard Extension
According to an article in The Loudoun Times, the extension of Pacific Boulevard in Sterling has been years in the making.
"On Oct. 19, several Loudoun Board of Supervisors members, Del. Tag Greason, several members representing the Kincora development and VDOT representatives gathered to break ground for the extension of Pacific Boulevard off Route 28.
"The extension is part of the Kincora development, a 424-acre mixed-use community that will be built between Routes 7 and 28. The development will host office, retail and residential spaces, including the much-anticipated baseball stadium that will be home to the Loudoun Hounds baseball team. The development will also host a 167-acre park, trails, a heron rookery observation deck and performing arts center."
Read the complete Loudoun Times article at http://www.loudountimes.com/index.php/news/article/pacific_boulevard_extension_underway454/
"On Oct. 19, several Loudoun Board of Supervisors members, Del. Tag Greason, several members representing the Kincora development and VDOT representatives gathered to break ground for the extension of Pacific Boulevard off Route 28.
"The extension is part of the Kincora development, a 424-acre mixed-use community that will be built between Routes 7 and 28. The development will host office, retail and residential spaces, including the much-anticipated baseball stadium that will be home to the Loudoun Hounds baseball team. The development will also host a 167-acre park, trails, a heron rookery observation deck and performing arts center."
Read the complete Loudoun Times article at http://www.loudountimes.com/index.php/news/article/pacific_boulevard_extension_underway454/
Tuesday, October 18, 2011
Northern Virginia Transportation Meeting
Secretary of Transportation Sean T. Connaughton and the Commonwealth Transportation Board will host a meeting in Fairfax next Tuesday, Oct. 25, for the public to provide input on the development of the Six-Year Improvement Program for fiscal years 2013-2018. The program includes multimodal highway, rail and public transportation initiatives.
The meeting will be held at VDOT’s Northern Virginia Office, 4975 Alliance Drive in Fairfax. The meeting starts at 6 p.m.
From 6-6:30 p.m. the public can visit displays and meet representatives from the Virginia departments of Transportation, Rail and Public Transportation, Aviation, Motor Vehicles and Port Authority.
Following the open house session, individuals can speak for up to three minutes or submit written comments. Speakers may register at the door; there is no pre-registration.
A draft Six-Year Improvement Program will be available next spring, and public hearings will be held before the program is finalized in June 2012.
The meeting will be held at VDOT’s Northern Virginia Office, 4975 Alliance Drive in Fairfax. The meeting starts at 6 p.m.
From 6-6:30 p.m. the public can visit displays and meet representatives from the Virginia departments of Transportation, Rail and Public Transportation, Aviation, Motor Vehicles and Port Authority.
Following the open house session, individuals can speak for up to three minutes or submit written comments. Speakers may register at the door; there is no pre-registration.
A draft Six-Year Improvement Program will be available next spring, and public hearings will be held before the program is finalized in June 2012.
Delays Near Dry Mill Road and Wage Drive
The Loudoun County Sheriffs Office is reporting that construction in the area of Dry Mill Road and Wage Drive is causing delays. Motorists in the area are advised to expect delays.
Monday, October 17, 2011
Riding Along with Loudoun County Public Safety
Here's part one in a four-part public safety ride-along series titled, "Riding Along" in the Loudoun Times.
Times staff writer Matt Vecchio spent a day each with members of the Loudoun County Sheriff’s Office, Loudoun Fire-Rescue and Animal Control.
An interesting read for sure. Check out the full Loudoun Times article:
http://www.loudountimes.com/index.php/news/article/riding_along_part_1_radio_chatter_and_red_bulls123/
Times staff writer Matt Vecchio spent a day each with members of the Loudoun County Sheriff’s Office, Loudoun Fire-Rescue and Animal Control.
An interesting read for sure. Check out the full Loudoun Times article:
http://www.loudountimes.com/index.php/news/article/riding_along_part_1_radio_chatter_and_red_bulls123/
West Market at North King Now Open
Update: The Loudoun County Sheriffs Office now reports that westbound at West Market Street and North King Street, which had been closed earlier this morning to a water leak, has now been re-opened.
West Market Street at North King Street Closure
The Loudoun County Sheriffs Office reports this morning that westbound West Market Street at North King Street is closed due to a water leak and that the closure is in effect until further notice. Motorists traveling around the area should be aware of the closure and expect delays.
Friday, October 14, 2011
Delays This Morning Around Morven Park
Motorists are advised of possible delays on Route 15 in the area of Morven Park due to an event today, Friday, October 24, according to the Loudoun County Sheriffs office. Delays began around 7 a.m.
Thursday, October 13, 2011
The Pitfalls of Texting
Texting – or emailing – while driving slows reaction time and makes drivers more likely to miss a flashing light, that according to new research from Texas A&M University’s Texas Transportation Institute.
In the study, 42 drivers between the ages of 16 and 54 drove on an 11-mile test course while sending or receiving text messages, and again while focusing completely on the road. The researchers asked the drivers to stop when they saw a flashing yellow light and recorded their reaction time.
The typical reaction time without texting was between one and two seconds, but while texting it increased to three to four seconds, regardless of whether the driver was typing or reading a text. The researchers also found that a texting driver was 11 times more likely to miss the flashing light.
Read more:
http://www.reuters.com/article/2011/10/06/uk-driving-texting-idUSLNE79500W20111006
In the study, 42 drivers between the ages of 16 and 54 drove on an 11-mile test course while sending or receiving text messages, and again while focusing completely on the road. The researchers asked the drivers to stop when they saw a flashing yellow light and recorded their reaction time.
The typical reaction time without texting was between one and two seconds, but while texting it increased to three to four seconds, regardless of whether the driver was typing or reading a text. The researchers also found that a texting driver was 11 times more likely to miss the flashing light.
Read more:
http://www.reuters.com/article/2011/10/06/uk-driving-texting-idUSLNE79500W20111006
Tuesday, October 11, 2011
$7.2 Million Traffic Calming Project Breaks Ground in Aldie
Congressman Frank Wolf, the Route 50 Task Force and the Virginia Department of Transportation (VDOT) broke ground this past Friday morning, Oct. 7, on a $7.2 million traffic calming project for the village of Aldie, located between Middleburg and Gilberts Corner in Loudoun County.
When completed in December 2012, Route 50 in Aldie will be transformed from a through highway to a village street, similar to the traffic calming project completed in Upperville.
Drivers approaching Aldie will be transitioned to the town speed limit with landscaping, sidewalks, and raised crosswalks and intersections in the village area. A series of pavers will be spaced to get drivers' attention. At the entrance to the village, the speed limit changes to 25 mph.
Traffic calming measures within Aldie include raised intersections, tree-planted medians, varying paving materials to indicate parking, walking, and driving areas, strategically placed greenery along the streets, and safer pedestrian walkways.
Drainage improvements will enclose a deep roadside ditch with a storm sewer system.
The materials used for the sidewalks, curbs, crosswalks, and raised intersections have been chosen to complement the historic and rural nature of the community.
The $7.2 million price tag includes $2.1 million for design, $300,000 for right of way acquisition and $4.8 million for construction.
This is the third traffic calming project on the rural Route 50 corridor in Fauquier and Loudoun counties designed to slow traffic, improve safety for pedestrians and motorists, and help preserve the historic and rural nature of the corridor.
The $7.8 million Upperville traffic calming project was completed in fall 2008, and the $16.1 million Gilberts Corner project, which replaced intersection with roundabouts, was completed in 2009. More information on the projects is available at www.Route50.org and www.VirginiaDOT.org.
When completed in December 2012, Route 50 in Aldie will be transformed from a through highway to a village street, similar to the traffic calming project completed in Upperville.
Drivers approaching Aldie will be transitioned to the town speed limit with landscaping, sidewalks, and raised crosswalks and intersections in the village area. A series of pavers will be spaced to get drivers' attention. At the entrance to the village, the speed limit changes to 25 mph.
Traffic calming measures within Aldie include raised intersections, tree-planted medians, varying paving materials to indicate parking, walking, and driving areas, strategically placed greenery along the streets, and safer pedestrian walkways.
Drainage improvements will enclose a deep roadside ditch with a storm sewer system.
The materials used for the sidewalks, curbs, crosswalks, and raised intersections have been chosen to complement the historic and rural nature of the community.
The $7.2 million price tag includes $2.1 million for design, $300,000 for right of way acquisition and $4.8 million for construction.
This is the third traffic calming project on the rural Route 50 corridor in Fauquier and Loudoun counties designed to slow traffic, improve safety for pedestrians and motorists, and help preserve the historic and rural nature of the corridor.
The $7.8 million Upperville traffic calming project was completed in fall 2008, and the $16.1 million Gilberts Corner project, which replaced intersection with roundabouts, was completed in 2009. More information on the projects is available at www.Route50.org and www.VirginiaDOT.org.
Monday, October 3, 2011
Update: Route 7 EB and WB Down to One Lane
The Loudoun County Sheriffs Office reports now that Route 7 Eastbound and Westbound is down to one lane at Hamilton Station Road due to a crash.
Route 7 Westbound Affected at Hamilton Station Road
The Loudoun County Sheriffs office reports that Route 7 westbound is down to one lane at Hamilton Station Road. Motorists in the area should use caution and expect delays.
Subscribe to:
Posts (Atom)









