Lane and Ramp Closures for the Week of Aug. 6-12

Phase 2 Dulles Corridor Metrorail Project crews are continuing road widening and striping, lane shifting, utility work, excavation and other construction activities for the Metrorail Silver Line, Phase 2.


Lane, shoulder, road and ramp closures will occur along the Dulles Toll Road (DTR), Dulles International Airport Access Highway (DIAAH), Dulles Greenway, Dulles Airport roads, and surrounding roads during the week of Aug. 6-12.


See below for more detailed information. All work is weather permitting.


Dulles Toll Road East

When:   Monday, August 7 - Friday, August 11, 10 a.m. to 3:30 p.m. and 9 p.m. to 5 a.m.

             Saturday, August 12, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.

What:    Alternating right and left lane closures of varying lengths

Where:  From mile marker 1.3 to 5.2 (from 1/10 mile past the Route 28 overpass to the Reston Parkway overpass)

Why:     Civil work

 

When:   Monday, August 7 - Saturday, August 12, 10 p.m. to 5 a.m.

What:    Alternating double right and double left lane closures

Where:  From mile marker 3.7 to 5.0 (from 3/10 mile past the Monroe Street/Van Buren Street overpass to 2/10 mile before the Reston Parkway overpass)

Why:     Utility work

 

Dulles Toll Road West

When:   Monday, August 7 - Friday, August 11, 9:30 a.m. to 3 p.m. and 8 p.m. to 5 a.m.

             Saturday, August 12, 10 a.m. to 3:30 p.m. and 8 p.m. to 5 a.m.

What:    Alternating right and left lane closures of varying lengths

Where:  From mile marker 5.7 to 1.5 (from approximately 2/10 mile after the Wiehle Avenue overpass to 3/10 mile before the Route 28 overpass)

Why:     Civil work

 

Dulles International Airport Access Highway (DIAAH) East

When:   Monday, August 7 - Friday, August 11, 8:30 a.m. to 3 p.m. and 6 p.m. to 5 a.m.

             Saturday, August 12, 5 a.m. to 2 p.m. and 6 p.m. to 5 a.m.

What:    Alternating right and left lane closures of varying lengths

Where:  From Saarinen Circle to mile marker 5.7 (5/10 mile past the Reston Parkway overpass)

Why:     Civil work

 

When:   Monday, August 7 - Saturday, August 12, 10 p.m. to 5 a.m.

What:    Full closure

Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass).  Follow detour.

Why:     Aerial guideway construction

 

When:   Monday, August 7 - Friday, August 11, 7 p.m. to 5 a.m.

What:    Two left lanes closed

Where:  From Saarinen Circle to mile marker 0.4 (near the Rudder Road overpass).

Why:     Aerial guideway construction

 

Dulles International Airport Access Highway (DIAAH) West

When:   Monday, August 7 - Friday, August 11, 7:30 a.m. to 2 p.m. and 7 p.m. to 5 a.m.

             Saturday, August 12, 5 a.m. to 2 p.m. and 8 p.m. to 5 a.m.

What:    Alternating right and left lane closures of varying lengths

Where:  From mile marker 5.7 to 200 feet past the ramp to Copilot Way on Saarinen Circle (from 5/10 mile before the Reston Parkway overpass to 6/10 mile past the Rudder Road overpass)

Why:     Civil work

 

When:   Monday, August 7 - Saturday, August 12, 10 p.m. to 5 a.m.

What:    Full closure

Where:  From mile marker 0.3 to Saarinen Circle (from 2/10 mile past the Rudder Road overpass to Saarinen Circle near Garage 1), traffic will be diverted around work area.

Why:    Aerial guideway construction

 

When:   Monday, August 7 - Friday, August 11, 7 p.m. to 5 a.m.

What:    Two left lanes closed

Where:  From mile marker 0.4 (near the Rudder Road overpass) to Saarinen Circle

Why:     Aerial guideway construction

 

Air Freight Lane North

When:   Monday, August 7 - Friday, August 11, 9 a.m. to 2 p.m.

What:    Northbound lane closed

Where:  From the south end of Air Freight Lane to Package Court.  Traffic will be flagged for safety.

Why:     Concrete pours

 

Rudder Road West

When:   Monday, August 7 - Friday, August 11, 6 p.m. to 5 a.m.

What:    Right lane closed

Where:  From the ramp to the Green Lot to the intersection of Rudder Road and the Blue Lot access road

Why:     Cable splicing

 

Dulles Greenway East

When:   Monday, August 7 - Friday, August 11, 10 a.m. to 6 pm. and 6 p.m. to 5 a.m.

             Saturday, August 12, 6 a.m. to 6 p.m.

What:    Alternating right and left lane closures of varying lengths

Where:  Between mile marker 7.6 and 14.0 (from Broadlands Boulevard to the end of the ramp to the eastbound Dulles Toll Road), short lane closures of varying lengths will occur

Why:     Road work

 

When:   Monday, August 7 - Saturday, August 12, 8 p.m. to 5 a.m.

What:    Two right lanes closed OR two left lanes closed

Where:  From mile marker 10.0 to 12.0 (from 2/10 mile past the Loudoun County Parkway overpass to 4/10 mile before the mainline toll plaza)

Why:     Aerial guideway construction

 

Dulles Greenway West

When:   Monday, August 7 - Friday, August 11, 6 a.m. to 3 p.m. and 8 p.m. to 6 a.m.

             Saturday, August 12, 6 a.m. to 6 p.m.

What:    Alternating right and left lane closures of varying lengths

Where:  Between mile marker 12.2 and 7.6 (from 2/10 mile past the mainline toll plaza to Broadlands Boulevard), short lane closures of varying lengths will occur

Why:     Civil work

 

Sunrise Valley Drive East and West

When:   Friday, August 11, 10 p.m. to 6 a.m.

Saturday, August 12, 10 p.m. to 6 a.m.

What:    Full closure

Where:  From Dulles Station Boulevard to Sayward Boulevard. Follow detour to Coppermine Road.

Why:     Pedestrian bridge installation

 

Old Meadow Road East

When:   Monday, August 7 - Thursday, August 10, 9:30 a.m. to 3:30 p.m.

What:    Close right lane

Where:  From Route 123 to 1,000 feet after Route 123

Why:     Test pits for utility relocation

 

Route 123 North

When:   Monday, August 7 - Thursday, August 10, 9:30 a.m. to 3:30 p.m.

What:    Close right turn lane

Where:  From the exit ramp from I-495 West to 200 feet after Old Meadow Road

Why:     Test pits for utility relocation



 