Transportation and Traffic Update from Catoctin District Supervisor

From the April e-newsletter ("Catoctin District Update") by Sally Kurtz, Catoctin District Supervisor on the Loudoun County Board of Supervisors, with updates on transportation projects, maintenance and traffic engineering items.

Transportation
Since 1998, Loudoun County and the Virginia Department of Transportation (VDOT) have been working together to provide roadway safety improvements along U.S. Route 15, specifically in the area between Leesburg and the Maryland State Line at Point of Rocks. Per the jointly approved U.S. Route 15 Safety Improvements Project, one of the focus areas will be safety improvements for the Village of Lucketts.

Recently, VDOT revived the project by selecting a consultant to develop the preliminary design. Design will follow the 2006 concept plan approved by the Lucketts-area citizens and Loudoun County. Through the preliminary design phase, the consultant will perform an updated survey, collect traffic data and complete a traffic analysis, and develop the preliminary design to current standards.

A public information session is anticipated to be held to update the citizens in the summer 2011.

Potholes
If you have concerns about specific roadway conditions, like potholes or dangerous ditches brought on by all of the rainy weather of late, call 1-800-FOR-ROAD (1-800-367-7623).

Potential Road Closure
There may be a long road closure of Edwards Ferry Road at the Battlefield Parkway intersection from June 20 to August 19 to speed up work on opening two lanes of the new Battlefield Parkway. Contact Renee LaFollette, Deputy Director of Capital Projects at rlafollette@leeburgva.gov or at 703-737-6071 for more information about this potential road closing.

VDOT Project Status
Maintenance
VDOT is preparing to begin repaving operations throughout the region. Sections of a number of Loudoun primary and secondary roads are included.

Preliminary Engineering Projects
Route 15 North - Plan for Lucketts Safety Initiatives – Project reinitiated with consultants updating traffic and survey data. Construction remains unfunded.

Route 7 – Operational Improvements Potomac View Road to Augusta Drive – Plans are being finalized for submission to VDOT and appropriate agencies; construction bid process planned for Spring, 2011. County and VDOT staff to meet to discuss outstanding issues with design elements.

Route 7 – East Market Street to South King Street [Sycolin Road Overpass Only] – After briefing the Leesburg Town Council and Board of Supervisors at a joint meeting in October, the scope of the project has been reduced to include only the Sycolin Road overpass. The consultant has been given direction accordingly. The anticipated cost is between $23-25 million. The project has been included on the illustrative project list developed as part of the recent transportation initiatives at the State level.

Route 7 Climbing Lane/West Market Street to Route 9 – The project was presented at the Shenstone community’s annual HOA meeting on March 9, 2011. The preliminary field inspection was held at VDOT’s March Project Day, and VDOT’s value engineering process was conducted March 22-23, 2011. Work on the NEPA document has been initiated and is anticipated to be complete by this summer. VDOT expects to hold its design public hearing in fall, 2011.

Route 7/659 Interchange Design (County Project) – Staff and the consultant are moving forward with the NEPA document. Additionally, the project has been included on the illustrative project list developed as part of the recent transportation initiatives at the State level. As with the Sycolin Road Overpass, staff will be monitoring the draft FY2012-2017 Six-Year Plan (to be released on April 20, 2011) to ensure that the project is shown in the Plan, with funding. In anticipation of the project receiving funding, County and VDOT staff met on March 2, 2011 to discuss options for project delivery. As it stands, the County will administer preliminary engineering to completion with a design-bid-build delivery, VDOT and the County will coordinate roles and responsibilities with respect to the NEPA document (meeting scheduled for March 30, 2011), VDOT will acquire ROW, and the County will administer construction of the project. An action item is being prepared for the April 13, 2011 Finance Committee meeting to authorize funding for final design.

Route 9 – Town of Hillsboro Pedestrian Improvement Project – A work session was held on March 17, 2011 to coordinate the historic and cultural resources component of the NEPA document and to coordinate the Town’s efforts to upgrade its water distribution system. The Virginia Department of Historical Resources (VDHR) has determined that the roundabouts contained within the project constitute an adverse impact on historic resources. An MOA will be required to address the findings of VDHR.

Lovettsville Bike Trail – The draft public hearing plans were presented to the Lovettsville Town Council on March 3, 2011. As currently designed, the project would have a significantly higher construction cost and significantly greater ROW impacts than what the Town can afford or had envisioned. VDOT is investigating options to reduce the project’s footprint and cost, but will need the Town’s concurrence to proceed with additional design.

Evergreen Mill Road/Ryan Road Intersection Improvements – The project scoping was held at VDOT’s March Project Day. The scope will include left- and right-turn lanes on Ryan Road. Work is under way to prepare preliminary field inspection plans.

Riverside Parkway(County Project – Revenue Sharing) – Notice to proceed was issued to the consultant and a kick-off meeting was held with VDOT on October 8, 2010. The consultant has established design parameters for the project and a traffic study has been completed to confirm the lane configuration. This information has been submitted to VDOT for preliminary review. Once VDOT responds to the proposed configuration, the consultant will resume work on the final design. Also, staff plans to meet with Potomac Station HOA to inform them of the preliminary design configuration when it is available.

Allder School Road– (County Project) – Alternatives analysis/design underway. The County and its consultant, Dewberry, have submitted design waivers for MS-19 requirements to both VDOT and County B and D staff. The County has approved the request but the VDOT response is still pending (expected week of March 28, 2011). The request specifically focuses on the Allder School Road bridge crossing of Catoctin Creek. The County is requesting a waiver from VDOT’s design criteria to allow for a smaller bridge structure. Project budget limitations, along with citizen concerns, make this a reasonable alternative to building a bridge structure that is out of scale and character with the surrounding community.

The Woods Road – The location survey for this project continues.

Sands and Taylor Road (CAD TBD) – These two paving projects are fully funded and are moving forward towards construction. Taylor Road is scheduled for completion first, with an anticipated completion date of November, 2012. Sands Road will be completed subsequently as it requires additional survey and design work not necessary for Taylor Road. The current estimate for completion is some time in 2013. A specific completion date will become more firm as the project progresses. In the meantime, the location survey for Sands Road has been initiated.

Ryan RoadShared-Use Path HSIP Application – Application submitted. Awards are expected in the June/July 2011 timeframe.

Traffic Engineering Items

Multi-Way Stop request at Potomac Station Drive – VDOT has stated that multiway stop signs can be put at either end of Binkley Circle or at Malloch and Cardston. A speed study was approved by the State Traffic Engineer’s Office for 45 mph on May 10, 2010. Given the results of the speed study, multi-way stop signs cannot be installed under traffic calming criteria. OTS staff will review the project in light of the speed study and will determine whether multi-way stops can be installed under operational criteria. Traffic counts are currently in progress.

Request by Fox Lee HOA for traffic calming (multi-way stop sign) and pavement markings in their community – VDOT will need a documented speedstudy and community petitions to consider the request further. Awaiting petitionsfrom citizens/HOA.

Shreve Mill Through-Truck Restriction – VDOT requires advertisement of public notice for through-truck restrictions that are being considered to allow for public comment. Advertisements for this through-truck restriction have been posted in local papers.

  For the latest Loudoun County traffic news and information, subscribe to Loudoun County Traffic via your favorite RSS reader, or get Loudoun County Traffic by e-mail.

Tuesday, March 22, 2011

Transportation Updates from the Catoctin District

Here's an update on transportation issues from the March e-newsletter of Sally Kurtz, Catoctin District Supervisor, Loudoun County Board of Supervisors.

Project Status
Route 7 – East Market Street to South King Street – After briefing the Leesburg Town Council and Board of Supervisors at a joint meeting in October, the scope of the project has been reduced to include only the Sycolin Road overpass. The consultant has been given direction accordingly.

Route 7 Climbing Lane/West Market Street to Route 9 – Preliminary engineering is proceeding based on the design presented to the adjacent neighborhoods at community meetings held last summer, with modifications to address concerns about emergency access and egress. Once evaluations are completed on the feasibility of improved egress at Roxbury Hall Road and Beacon Hill Drive, work on the NEPA document can begin. The design public hearing is anticipated for late 2011 or early 2012.

Lovettsville Bike Trail – VDOT continues to refine the project plans. Upon completion, work on the NEPA document will begin.

Bridge on Gleedsville Road over Sycolin – The title sheet and supporting documents have been submitted to the VDOT Central Office for signature. ROW acquisition is expected to begin in the January/February timeframe.

Evergreen Mill Road/Ryan Road Intersection Improvements – VDOT has determined that the project qualifies for Highway Safety Improvement Program (HSIP) funding. Location and Design staff members are coordinating to initiate the design process using one of VDOT’s on-call consultants.

Riverside Parkway (County Project – Revenue Sharing) – Notice to proceed was issued to the consultant and a kick-off meeting was held with VDOT on October 8, 2010. The consultant is moving forward to establish design parameters. The first task has been to establish a typical section and evaluate right-of-way impacts.

Gum Spring Road HSIP Project (CAD TBD) – The location survey has been completed and the design is underway. The project is coordinating with Luck Stone Quarry regarding the relocation of Gum Spring Road to the south.

Crosstrails Boulevard and Kincaid Boulevard – Design work is underway. A citizen’s information meeting was held on November 8, 2010 at Heritage High School. Subsequent meetings have been held with citizens from Kincaid Forest, with some residents expressing concerns regarding cut-through traffic. At its December 15th meeting, the Finance Committee approved staff’s request for a change order to complete an archaeological survey on the southernmost segment of the proposed alignment. Staff are working with the appropriate authorities to gain entry to several parcels in that area that to date have been inaccessible.

Allder School Road – (County Project) – Alternatives analysis/design underway. A design waiver (FSM Waiver) has been submitted to B&D for hydrologic issues associated with the bridge. This will need to be approved by the County before VDOT will respond to design waivers submitted to VDOT staff. If this issue can be resolved in a timely manner, a design public hearing may be possible for February or March, 2011.

The Woods Road – A meeting of “The Woods Road Realignment Committee” was held on December 1st. At that meeting, staff conveyed to the Committee its plan to have VDOT take the lead on the project. Committee members in attendance expressed support for VDOT’s involvement and agreed to the preferred study corridor previously developed for the project. This information has been conveyed to VDOT.

Traffic Engineering Items
Multi-Way Stop request at Potomac Station Drive – VDOT has stated that multi-way stop signs can be put at either end of Binkley Circle or at Malloch and Cardston. A speed study was approved by the State Traffic Engineer’s Office for 45 mph on May 10, 2010. Given the results of the speed study, multi-way stop signs cannot be installed under traffic calming criteria. OTS staff will review the project in light of the speed study and will determine whether multi-way stops can be installed under operational criteria.

Remember, if you have concerns about specific roadway conditions, like potholes or dangerous ditches brought on by the latest winter conditions, call 1-800-FOR-ROAD (1-800-367-7623).

  For the latest Loudoun County traffic news and information, subscribe to Loudoun County Traffic via your favorite RSS reader, or get Loudoun County Traffic by e-mail.

Saturday, October 9, 2010

Transportation Update from Sally Kurtz, Catoctin District Supervisor

Sally Kurtz, Catoctin District Supervisor on the Loudoun County Board of Supervisors, provides a transportation update in her latest e-newsletter (October edition).

Maintenance/Paving

The following road segments are currently planned for re-paving:
  • Rt. 7W from Rt. 287 to Rt. 719 bridge
  • Rt. 7W from Rt. 711 to Clarke County line
  • Rt. 7E from Clarke Co. line to Rt. 1330
  • Rt. 15S from Roundabout to Prince William County line
  • Rt. 50W from Rt. 611 to the beginning of duals west of Middleburg

Preliminary Engineering Projects
  • Route 15 North - Plan for Lucketts Safety Initiatives (CAD TBD) – VDOT staff is going through the process of securing approvals for a consultant to complete the design work. There is no funding identified to move the project to construction.
  • Route 15 South Widening/Leesburg Line to Woodlea Drive – This project (installation of turn lanes at the Animal Park and a bike trail from Woodlea Drive to Virt’s Corner). Utility relocation is underway.
  • Edwards Ferry Road (TBD) – No activity on this project as resources have been diverted to other time sensitive projects.
  • Route 7 – East Market Street to South King Street – Traffic data was collected in October 2009 for updates to the forecast model that will be used for any reduction in design year Level of Service and to investigate potential short term operational improvements at the Sycolin Road intersection.
  • Route 7 – Climbing Lane/West Market Street to Route 9 – A notice to proceed was issued to RK&K for the next stage of traffic analysis that will look at the impacts of closing the four median breaks and to make recommendations of measures to address the resulting U-turn movements (i.e. modifications to the Route 9 and West Market Street interchanges and possible acceleration lanes). Acceleration lanes are not reflected in the current project cost estimates. The Board and NVTA have approved transfer of the FY10 RSTP funds to this project as well as using FY11 RSTP funds on this project.
  • Route 7/659 Interchange Design (County Project) – The Board of Supervisors approved the conceptual design. Design work by Dewberry continues. County staff and the design firm have held several meetings with impacted property owners from the four quadrants of the interchange.
  • Lovettsville Bike Trail – VDOT is now handling the project for the Town of Lovettsville. The task order with RK&K has not been executed as yet. The Town staff requested changes to the consultant’s scope of work.
  • HSIP Funds – Signage, pavement markings and signal adjustments for bicycle accommodations on Route 15 from Balls Bluff Road to White’s Ferry Road - Coordination continues with the Town of Leesburg and Loudoun staff to investigate the feasibility of the Town taking over the grant in order to build a shared use path for the Tuscarora High School.
  • Bridge on Gleedsville Road over Sycolin (CAD Fall 2011) – A public hearing was held on November 18th from 6 to 9 p.m. at Heritage High School. Approximately 24 people attended. Most of the attendees liked the design but there were a few who commented that the project was too large and would result in too many trees being removed. There were others who supported the paved shoulders noting the benefit of improved visibility and refuge from traffic for the joggers. VDOT staff will look into accelerating the scheduled from spring 2012 to the fall of 2011 in order to utilize the full 2012 construction season.
  • Riverside Parkway (County Project – Revenue Sharing) – County staff is coordinating with the developer of the Fort Evans Road improvements to determine the best way to design the two projects that share the Riverside Parkway/Fort Evans Road/River Creek Parkway intersection improvements.

  For the latest Loudoun County traffic news and information, subscribe to Loudoun County Traffic via your favorite RSS reader, or get Loudoun County Traffic by e-mail.

Friday, August 20, 2010

Transportation Update from Sally Kurtz, Catoctin District Supervisor

Sally Kurtz, Catoctin District Supervisor with the Loudoun County Board of Supervisors, had lots of transportation related updates in her August Catoctin District newsletter. We've reprinted the traffic/transit/transportation related items below.

Current Projects
Loudoun County Parkway/Route 7 Interchange (County Project): The construction is well underway. Base asphalt is being placed on the ramps. Final costs are being worked out for the Route 7 westbound 4th lane widening. The project should be completed by late 2010.

Maintenance/Paving
The following road segments are currently planned for re-paving:
  • Rt. 7W from Rt. 287 to Rt. 719 bridge
  • Rt. 7W from Rt. 711 to Clarke Co. line
  • Rt. 7E from Clarke Co. line to Rt. 1330
  • Rt. 15S from Roundabout to Prince William Co. line (subject to change)
  • Rt. 15/7 Bypass N&S from Rt. 15 bridge to East Market street bridge (Leesburg city limit)
  • Rt. 28 N&S from Rt.7 to Rt. 625
  • Rt. 50W from Rt. 611 to the beginning of duals west of Middleburg
Preliminary Engineering Projects
Route 15 North - Plan for Lucketts Safety Initiatives (CAD TBD) – VDOT staff is going through the process of securing approvals for a consultant to complete the design work. There is no funding identified to move the project to construction.

Route 15 South Widening/Leesburg Line to Woodlea Drive – This project (installation of turnlanes at the Animal Park and a bike trail from Woodlea Drive to Virt’s Corner). Utility relocation is underway.

Edwards Ferry Road (TBD) – No activity on this project as resources have been diverted to other time sensitive projects.

Route 7 – East Market Street to South King Street – Traffic data was collected in October 2009 for updates to the forecast model that will be used for any reduction in design year Level of Service and to investigate potential short term operational improvements at the Sycolin Road intersection.

Route 7 – Climbing Lane/West Market Street to Route 9 – A notice to proceed was issued to RK&K for the next stage of traffic analysis that will look at the impacts of closing the four median breaks and to make recommendations of measures to address the resulting U-turn movements (i.e. modifications to the Route 9 and West Market Street interchanges and possible acceleration lanes). Acceleration lanes are not reflected in the current project cost estimates. The Board and NVTA have approved transfer of the FY10 RSTP funds to this project as well as using FY11 RSTP funds on this project.

Route 7/659 Interchange Design (County Project) – The Board of Supervisors approved the conceptual design. Design work by Dewberry continues. County staff and the design firm have held several meetings with impacted property owners from the four quadrants of the interchange.

Lovettsville Bike Trail – VDOT is now handling the project for the Town of Lovettsville. The task order with RK and K has not been executed as yet. The Town staff requested changes to the consultant’s scope of work.

HSIP Funds – Signage, pavement markings and signal adjustments for bicycle accommodations on Route 15 from Balls Bluff Road to White’s Ferry Road - Coordination continues with the Town of Leesburg and Loudoun staff to investigate the feasibility of the Town taking over the grant in order to build a shared use path for the Tuscarora High School.

Bridge on Gleedsville Road over Sycolin (CAD Fall 2011) – A public hearing was held on November 18th from 6 to 9 p.m. at Heritage High School. Approximately 24 people attended. Most of the attendees liked the design but there were a few who commented that the project was too large and would result in too many trees being removed. There were others who supported the paved shoulders noting the benefit of improved visibility and refuge from traffic for the joggers. VDOT staff will look into accelerating the scheduled from spring 2012 to the fall of 2011 in order to utilize the full 2012 construction season.

Riverside Parkway (County Project – Revenue Sharing) – County staff is coordinating with the developer of the Fort Evans Road improvements to determine the best way to design the two projects that share the Riverside Parkway/Fort Evans Road/River Creek Parkway intersection improvements.

Pacific Boulevard – Dresden Road to Relocation Drive (CAD Spring 2011) – Preparation of the Environmental document is underway. Updating of the design plans is underway by the Central Office in-house design staff. The completed scoping documents have been sent to the Central Office for approval. A design public hearing will be held when the draft Environmental Assessment is completed. The STIP amendment was approved by FHWA on November 19, 2009. VDOT’s cost estimate of $14.5 million assumes right of way will be donated.

Pacific Boulevard – Relocation Drive to Sterling Boulevard (CAD 02/10) – On schedule. Public involvement in the form of a Posting of Willingness is completed.

For more details, contact Kurtz at 703-777-0204. And thanks to the Supervisor for letting us reprint the information from her newsletter for our readers.