Transportation Project Updates from Catoctin District Supervisor Sally Kurtz

From the January/February Catoctin District Update e-newsletter from Sally Kurtz, Catoctin District Supervisor, Loudoun County Board of Supervisors, we get a transportation update.

Project Status
Route 7 – East Market Street to South King Street – After briefing the Leesburg Town Council and Board of Supervisors at a joint meeting in October, the scope of the project has been reduced to include only the Sycolin Road overpass. The consultant has been given direction accordingly.

Route 7 Climbing Lane/West Market Street to Route 9 – Preliminary engineering is proceeding based on the design presented to the adjacent neighborhoods at community meetings held last summer, with modifications to address concerns about emergency access and egress. Once evaluations are completed on the feasibility of improved egress at Roxbury Hall Road and Beacon Hill Drive, work on the NEPA document can begin. The design public hearing is anticipated for late 2011 or early 2012.

Lovettsville Bike Trail – VDOT continues to refine the project plans. Upon completion, work on the NEPA document will begin.

Bridge on Gleedsville Road over Sycolin – The title sheet and supporting documents have been submitted to the VDOT Central Office for signature. ROW acquisition is expected to begin in the January/February timeframe.

Evergreen Mill Road/Ryan Road Intersection Improvements – VDOT has determined that the project qualifies for Highway Safety Improvement Program (HSIP) funding. Location and Design staff members are coordinating to initiate the design process using one of VDOT’s on-call consultants.

Riverside Parkway (County Project – Revenue Sharing) – Notice to proceed was issued to the consultant and a kick-off meeting was held with VDOT on October 8, 2010. The consultant is moving forward to establish design parameters. The first task has been to establish a typical section and evaluate right-of-way impacts.

Gum Spring Road HSIP Project (CAD TBD) – The location survey has been completed and the design is underway. The project is coordinating with Luck Stone Quarry regarding the relocation of Gum Spring Road to the south.

Crosstrails Boulevard and Kincaid Boulevard – Design work is underway. A citizen’s information meeting was held on November 8, 2010 at Heritage High School. Subsequent meetings have been held with citizens from Kincaid Forest, with some residents expressing concerns regarding cut-through traffic. At its December 15th meeting, the Finance Committee approved staff’s request for a change order to complete an archaeological survey on the southernmost segment of the proposed alignment. Staff are working with the appropriate authorities to gain entry to several parcels in that area that to date have been inaccessible.

Allder School Road – (County Project) – Alternatives analysis/design underway. A design waiver (FSM Waiver) has been submitted to B&D for hydrologic issues associated with the bridge. This will need to be approved by the County before VDOT will respond to design waivers submitted to VDOT staff. If this issue can be resolved in a timely manner, a design public hearing may be possible for February or March, 2011.

The Woods Road – A meeting of “The Woods Road Realignment Committee” was held on December 1st. At that meeting, staff conveyed to the Committee its plan to have VDOT take the lead on the project. Committee members in attendance expressed support for VDOT’s involvement and agreed to the preferred study corridor previously developed for the project. This information has been conveyed to VDOT.

Traffic Engineering Items
Multi-Way Stop request at Potomac Station Drive – VDOT has stated that multi-way stop signs can be put at either end of Binkley Circle or at Malloch and Cardston. A speed study was approved by the State Traffic Engineer’s Office for 45 mph on May 10, 2010. Given the results of the speed study, multi-way stop signs cannot be installed under traffic calming criteria. OTS staff will review the project in light of the speed study and will determine whether multi-way stops can be installed under operational criteria.

1-800-FOR-ROAD
If you have concerns about specific roadway conditions, like potholes or dangerous ditches brought on by the latest winter conditions, call 1-800-FOR-ROAD (1-800-367-7623).

  For the latest Loudoun County traffic news and information, subscribe to Loudoun County Traffic via your favorite RSS reader, or get Loudoun County Traffic by e-mail.

Saturday, October 9, 2010

Transportation Update from Sally Kurtz, Catoctin District Supervisor

Sally Kurtz, Catoctin District Supervisor on the Loudoun County Board of Supervisors, provides a transportation update in her latest e-newsletter (October edition).

Maintenance/Paving

The following road segments are currently planned for re-paving:
  • Rt. 7W from Rt. 287 to Rt. 719 bridge
  • Rt. 7W from Rt. 711 to Clarke County line
  • Rt. 7E from Clarke Co. line to Rt. 1330
  • Rt. 15S from Roundabout to Prince William County line
  • Rt. 50W from Rt. 611 to the beginning of duals west of Middleburg

Preliminary Engineering Projects
  • Route 15 North - Plan for Lucketts Safety Initiatives (CAD TBD) – VDOT staff is going through the process of securing approvals for a consultant to complete the design work. There is no funding identified to move the project to construction.
  • Route 15 South Widening/Leesburg Line to Woodlea Drive – This project (installation of turn lanes at the Animal Park and a bike trail from Woodlea Drive to Virt’s Corner). Utility relocation is underway.
  • Edwards Ferry Road (TBD) – No activity on this project as resources have been diverted to other time sensitive projects.
  • Route 7 – East Market Street to South King Street – Traffic data was collected in October 2009 for updates to the forecast model that will be used for any reduction in design year Level of Service and to investigate potential short term operational improvements at the Sycolin Road intersection.
  • Route 7 – Climbing Lane/West Market Street to Route 9 – A notice to proceed was issued to RK&K for the next stage of traffic analysis that will look at the impacts of closing the four median breaks and to make recommendations of measures to address the resulting U-turn movements (i.e. modifications to the Route 9 and West Market Street interchanges and possible acceleration lanes). Acceleration lanes are not reflected in the current project cost estimates. The Board and NVTA have approved transfer of the FY10 RSTP funds to this project as well as using FY11 RSTP funds on this project.
  • Route 7/659 Interchange Design (County Project) – The Board of Supervisors approved the conceptual design. Design work by Dewberry continues. County staff and the design firm have held several meetings with impacted property owners from the four quadrants of the interchange.
  • Lovettsville Bike Trail – VDOT is now handling the project for the Town of Lovettsville. The task order with RK&K has not been executed as yet. The Town staff requested changes to the consultant’s scope of work.
  • HSIP Funds – Signage, pavement markings and signal adjustments for bicycle accommodations on Route 15 from Balls Bluff Road to White’s Ferry Road - Coordination continues with the Town of Leesburg and Loudoun staff to investigate the feasibility of the Town taking over the grant in order to build a shared use path for the Tuscarora High School.
  • Bridge on Gleedsville Road over Sycolin (CAD Fall 2011) – A public hearing was held on November 18th from 6 to 9 p.m. at Heritage High School. Approximately 24 people attended. Most of the attendees liked the design but there were a few who commented that the project was too large and would result in too many trees being removed. There were others who supported the paved shoulders noting the benefit of improved visibility and refuge from traffic for the joggers. VDOT staff will look into accelerating the scheduled from spring 2012 to the fall of 2011 in order to utilize the full 2012 construction season.
  • Riverside Parkway (County Project – Revenue Sharing) – County staff is coordinating with the developer of the Fort Evans Road improvements to determine the best way to design the two projects that share the Riverside Parkway/Fort Evans Road/River Creek Parkway intersection improvements.